The lower part is assembled by
Build the rack, then install the motor, chain, drive, power supply, and other parts to the lower part of the main frame
The upper part of the main uni
Build the frame,and then install the motors, belts, rollers,indicators and other parts of the main engine part to the main machine part of the rack
Cloth knife assembly
Install the control line, motor, and cloth cutter onto the cutter track
Circuit board assembly
Circuit board assembly
Machine commissioning
The machine is energized for functional testing and commissioning